question

Amanda Prado avatar image
0 Likes"
Amanda Prado asked Amanda Prado edited

Break to error

Break_Doubt.fsm
I don't understand the behavior of my task executor.

What I want to represent is:

TE comes out loaded with 33 items from the "Scanners" queue and makes the sequential transports in the queues following the connection order. When it unloads the 33 items in the respective queues, after unloading, it loads a shelf (here represented only by the box) and takes it to the "Scanners" queue, where it will again load 33 items and take them to the next queue (now connection 2). It leaves the 33 items there, then loads a shelf and returns to the Scanners queue. This cycle repeats in a loop.

Note that in the simulation, the first transport occurs as expected, which is exactly what I expect for all the other queues. However, when the TE unloads the Shelf and goes to load another 33 scanners, the error message appears (model attached) and it loads only 1 scanner and not the 33 as expected.

I can't understand what might be happening.


Can someone help me?


Thank you very much.

FlexSim 25.0.1
agvbatchbreak to
break-doubt.fsm (178.9 KiB)
5 |100000

Up to 12 attachments (including images) can be used with a maximum of 23.8 MiB each and 47.7 MiB total.

0 Answers