Hi
How can i delay a the setup phase so that the operator reaches the processor. As far as i know, once the item arrived to the machine the setup is started, but how can i makeit wait for the operator to do the setup?
Thanks
Hi
How can i delay a the setup phase so that the operator reaches the processor. As far as i know, once the item arrived to the machine the setup is started, but how can i makeit wait for the operator to do the setup?
Thanks
That should'nt be the case. If you check the small "Use Operator(s)" check box under the setup time field. The setup time should not start before the operator arrives. In fact the, if you checked this box the processor should go into waiting for operator while it waits for the operator to start setup time.
The operator used should be connected to the processor via center connection or other type of referencing.
11 People are following this question.
FlexSim can help you understand and improve any system or process. Transform your existing data into accurate predictions.
FlexSim is a fully 3D simulation software environment. FlexSim can be used to simulate any process in any industry.
FlexSim®, FlexSim Healthcare™, Problem Solved.®, the FlexSim logo, the FlexSim X-mark, and the FlexSim Healthcare logo with stylized Caduceus mark are trademarks of FlexSim Software Products, Inc. All rights reserved.
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © Autodesk Inc. All rights reserved