Connect one transporter/forklift to all work stations

How to use only 1 transporter for moving all stations with different speed and transportation time data between stations?

1. Picking up raw materials = transportation time 18.43 minutes with a speed of 0.03 m/s.

2. Carrying semi-finished goods from the Lathe = transportation time 6.9 minutes with a speed of 0.3 m/s.

3. Lifting semi-finished goods to the assembly process = transportation time 6.4 minutes with a speed of 0.01 m/s,

4. Carrying finished goods to the putty place from the assembly machine = transportation time 14.54 minutes with a speed of 0.19 m/s,

5. Carrying finished goods from the putty/paint machine = transportation time 6.18 minutes with a speed of 0.08 m/s.


This my model

percobaan-11.fsm

FlexSim 22.2.0
forklift travelforklift pathtransporter pathtransportor
percobaan-11.fsm (170.8 KiB)