Doubt - Event Triggered Source.fsmHello Community,
I am in the early stages of developing a production line supply model and I am facing a dificult with my event triggered source. The ideia is:
At the beginning of the shift, each station in the production line is supplied by a source from the 3D model. This supply occurs in bins. Each station is represented by a processor. Each processor has its own processing time, based on the quantity of items in each bin + the product's cycle time.
The system works with 2 bins, that is, whenever one bin runs out, another must be replenished.
I then thought about WHEN THE CONTENT OF THE QUEUE THAT PRECEDES THE PROCESSOR REACHES 1, then a token is created in the PF to start the AGV transport process.
Does anyone have an idea of a better way to do this or guide me as to why two tokens are being created in my source?
The model is attached.
I tried hard to understand the ready-made template on material replenishment that exists, but I was unable to understand how it works. I would like to take this opportunity to see if anyone has a step-by-step guide on how to use the template. It would be fantastic.
Thank you very much in advance.